• Sort Blog:
  • All
  • Custom Home
  • News/Updates
  • Renovation
  • Uncategorized

Back to blogging

It's been a while since we have blogged about anything. However, in this day and age, it's one of the only

Happy Holidays

It's been quite a while since the last public post on our current project.  We were previously providing progress reports via video

Foundation wall forming

This is a quick video indicating the pre concrete pour condition on the lakeshore project. http://www.youtube.com/watch?v=K1RKnOjmpw8&feature=youtube_gdata_player

Lakeshore foundation progress

Check out the 360 degree view of our footing and forming progress. http://www.uscapeit.com/share.aspx?tourId=35288

Lakeshore Shoring Wall

This video displays the Shoring wall required on our Lakeshore project to protect the neighboring trees on the adjacent property. http://www.youtube.com/watch?v=F9_A712OYSo&feature=youtube_gdata_player

Lakeshore Demolition

We have a series of videos displaying the demolition procedure of our Lakeshore project. http://www.youtube.com/watch?v=eQzYmUcpfFM&feature=youtube_gdata_player

Lakeshore Project

We begin here. This is the first time on site for me and this is what the site currently looks like. http://www.youtube.com/watch?v=HzgeHPabqTk&feature=youtube_gdata_player

Gallery: York Mills Estate

[singlepic id=17 w=450] A new gallery: York Mills Estate This York Mills custom home took us just under 18 months from demolition to

Vermiculite Insulation

Upon receiving a home energy audit from The Energuy (www.Energuy.ca) we were notified that the insulation in the attic contained vermiculite. The

Addition Added

The addition is up. The roof is tied in. This extension will include an ensuite and walk in closet for the master